- Environmental monitoring with uChipPosted 3 days ago
- ARDULEGO KIT: create with Lego and ArduinoPosted 3 weeks ago
- Share & Discover by PCBWayPosted 4 weeks ago
- ENERGY METER IOTPosted 1 month ago
- Energy Meter GSM with Arduino (part 2)Posted 1 month ago
- Energy Meter GSM with Arduino (part 1)Posted 2 months ago
- ARDULOCK: a keyboard with RFID modulePosted 2 months ago
- Autofocus Glasses/Phoropter Using Variable Focus Liquid LensPosted 4 months ago
- Home Automation & Lights controlling SystemPosted 4 months ago
- Solar TrackerPosted 4 months ago
World’s first 3D-printed office opens in Dubai
The world’s first 3D-printed office building opened this week in Dubai, Reuters reports. The 2,700-square-foot, single-story building was built in just 17 days using a gigantic, 20-foot tall 3D printer and a special mix of concrete, fiber reinforced plastic and glass fiber reinforced gypsum.
Although the “printer” was massive at about two stories tall, 120 feet long and 40 feet wide, it only needed one staffer to make sure it was functioning properly. The rest of the 18-person construction crew consisted of installers, electricians and mechanical engineers who completed the job for a mere $140,000 in construction and labor costs — or about half the price of a comparable structure built with conventional methods.
Next year, the structure is scheduled to become the home of Dubai’s Museum of the Future.