- How to Adjust X and Y Axis Scale in Arduino Serial Plotter (No Extra Software Needed)Posted 5 months ago
- Elettronici Entusiasti: Inspiring Makers at Maker Faire Rome 2024Posted 5 months ago
- makeITcircular 2024 content launched – Part of Maker Faire Rome 2024Posted 7 months ago
- Application For Maker Faire Rome 2024: Deadline June 20thPosted 8 months ago
- Building a 3D Digital Clock with ArduinoPosted 1 year ago
- Creating a controller for Minecraft with realistic body movements using ArduinoPosted 1 year ago
- Snowflake with ArduinoPosted 1 year ago
- Holographic Christmas TreePosted 1 year ago
- Segstick: Build Your Own Self-Balancing Vehicle in Just 2 Days with ArduinoPosted 1 year ago
- ZSWatch: An Open-Source Smartwatch Project Based on the Zephyr Operating SystemPosted 1 year ago
Price Reduction for 4-layer & 6-layer by PCBWay
Since PCBWay moved to the new factory, after a year of adjustment, our production capacity and efficiency have been greatly improved. In order to give back to our customers for their support, we decide to adjust the price of PCB:
1. Up to 20% discount for 4-layer PCBs and 6-layer PCBs
2. Bulk order prices also dropped, and quotation of large-scale orders can be negotiated
3. For 1-6 layer PCB, “min Track/Spacing 5/5mil” or “Min Hole Size 0.25mm” design will get a big discount.
For the questions you may concern:
Q:When does the event start and who can get the discount?
A:From 5th,Aug and all PCBWay customers could enjoy the discount
Q: Can the PCB quality be guaranteed when the price is reduced ?
A: PCBWay always puts quality in the first place and will surely not sacrifice quality for low price. We will still use Tg150 or above base material after the price is reduced.
Q: Will there be insufficient production capacity during the event and result in delayed delivery?
A: After PCBWay moved to the new factory, the production capacity of multi-layer PCB can be as high as tens of thousands of square meters per month. And we purchased VLP-270 and other machines, which can fully guarantee the lead time.